|
|
rack-top-rear
Here is a rear top view of the rack, showing the empty punchdowns.
Date: 03/05/2001
Views: 259
|
|
|
rack-construction
This is a picture of the full rack. It has been mounted and the cables run, but not yet punched down.
Date: 03/05/2001
Views: 251
|
|
|
|
finished-main-patch
This is the rear of the main distribution patch panel after it was completely punched.
Date: 10/20/2004
Views: 250
|
|
|
rack-top-front
Here is a front top view of the rack with the unpunched wires hanging through.
Date: 03/05/2001
Views: 250
|
|
|
|
finished-rack-rear
Here is a rear view of the rack after it was complete and components were installed. As you can see, I ran several extra wires.
Date: 10/20/2004
Views: 245
|
|
|
ceiling-bundle
This is the final bundle of wires routed through the basement ceiling.
Date: 03/05/2001
Views: 241
|
|
|
|
finished-rack-front
Here is a front view of the rack after it was complete and components were installed.
Date: 10/20/2004
Views: 241
|
|
|
main-distribution
This is a front view of the main distribution center.
Date: 10/20/2004
Views: 236
|
|
|
|
main-distribution-rear
This is a rear view of the main distribution center. The punching is half done.
Date: 03/05/2001
Views: 224
|
|
|